December 2025 Newsletter

Secured Project
Millom Leisure Centre

We are delighted to be working with Thomas Armstrong Construction on the Millom Leisure Centre Development, where we will be installing robust Protan roofing system.
The new Millom Activity and Leisure Centre will form a modern hub for the community, providing a swimming pool, sports hall, fitness studios and gym alongside dedicated space for health and wellbeing services.
Beginning the build-up we will be installing the Protan self-adhesive bituminous vapour control layer across all roof areas, followed by the insulation using Kingspan PIR insulation boards
A combination of Protan SE and Protan EX-A single ply membranes in dark grey will be installed to complete the roofing build ups for the different roof zones.
As part of the works, additional detailing will be included to ensure both the performance and usability of the completed roofing systems, for surface protection and walkways- Where required, will be installed using Protan GT2.4 membrane.
To find out more about the full build-up, have a read of our blog:

Secured Project- Millom Leisure Centre

Secured Project
Chorlton Baths

We’re delighted to be working again with Caddick Construction on the Chorlton Baths development in Chorlton-cum-Hardy, a £14 million scheme delivering 50 high-quality, low-carbon apartments for over-55s, supported by MSV Housing, Manchester City Council, GMCA, and Homes England.

We will be installing a range of IKO flat roofing systems across the development, including Blocks A and B, the lift core roof, access deck levels, balconies, and walkways.

Our works include the installation of IKO Ultra Gold Cap Sheet, IKO Ultra T-F Underlay, Enertherm Gold Insulation, and IKO Ultra S-A VCL, providing long-lasting waterproofing, durability, and thermal performance.

All roofs will undergo electronic leak detection testing and IKO technical inspections, enabling a 20-year IKO Guarantee.

To find out more about the full build-up, have a read of our blog:

Secured Project-Chorlton Baths