Case Study- Burnley College Industry Hub North Campus

Burnley College Industry Hub North Campus

Project: Burnley College Industry Hub North Campus P2 Address: Burnley College, Princess Way, BB12 0AN Architects: ABW Architects Main Contractor: John Turner Construction Roof Size: 1420 m² Roof System: Sikaplan G 1.8 mm PVC membrane with 25-year guarantee, Sikatherm® PIR AL insulation Installation Type: Mechanically fixed About the Project at Burnley College Industry Hub North […]

Case Study- Brackley Street, Farnworth Green

Brackley Street

  Project:             Brackley Street, Farnworth Green   Address:           Farnworth Green, Farnworth, Bolton, BL4 9EG   Architects:        BDP   Contractor:      Vermont Construction (Manchester) Ltd   Roof size:           1309m2 total roof size   Roof system:    Alumasc Alkorplan & […]

Case Study- Burnley College

Burnley college

Project:           Burnley College, Teaching Block & Sports Centre Extension Address:         Burnley College, Princess Way, Burnley, BB12 0AN Architects:       ABW Architects Ltd Contractor:     John Turner Roof size:       1200m2 Roof system:   Sika Sarnafil Single Ply Roof, G410-20EL, Sikatherm PIR GT Insulation, Sarnavap 500E SA vapour […]

Case Study- Clayton Triangle

Project:              Clayton Triangle Address:            Whally Road, Clayton-Le-Moors, Accrington, BB55HD Architects:         tadw Architects Contractor:       Watson Homes Roof size:            921m2 Roof system:     Alumasc Alkorplan Membrane Installation:       Mechanically Fixed About the project: The development […]

Case Study- ABInBev development

ABInBev development

Project:           ABInBev Address:         ABlnBev UK, Curedale Lane, Samlesbury, PR5 0XD Architects:     Patrick Parsons Contractor:    Morris & Spottiswood Roof size:        104m2 Roof system:   S-Vap 500 E, Sikatherm® PIR AL, Sikaplan® G-15, mechanically fastened Our role in the project at ABInBev UK: Here at Enviroply […]